Broadband datasets
Measures
Each measure is one kind of value you can request, using its id.
| Measure | Unit | Combining areas |
|---|---|---|
Superfast broadband availabilitybroadband-superfast-availability | % of premises | Not combined |
Ultrafast broadband availabilitybroadband-ultrafast-availability | % of premises | Not combined |
Full fibre availabilitybroadband-full-fibre-availability | % of premises | Not combined |
Gigabit broadband availabilitybroadband-gigabit-availability | % of premises | Not combined |
“Adds up” means you can total it over areas or convert it to other areas. See Measures and periods for why some can't be combined.
Areas and years
Request each of these with its geography and code year as geography and boundaryYear.
| Areas | Code year | Periods | Covers | Records |
|---|---|---|---|---|
| Local authorities | 2024 | July 2025 | UK | 361 |
Things to know
- Premises able to receive download speeds of at least 30 Mbit/s.
- Availability, not take-up: a premises counts where the service can be ordered, whether or not anyone there has it.
- This is a share of premises, so it does not add over areas. Combining authorities needs a mean weighted by premises, which the source publishes but this measure does not serve; averaging the percentages flat would weigh a small authority as heavily as a city.
- Ofcom's July 2025 Connected Nations snapshot, on local authority codes shared by every release from May 2023 to December 2024.
- Premises able to receive download speeds of at least 100 Mbit/s.
- Premises where a full fibre connection, fibre all the way to the premises, is available.
Show 1 moreShow fewer
- Premises able to receive download speeds of at least 1 Gbit/s, by any technology.
Corrections and improvements
These reviewed changes apply to what the API serves for this data. The publisher's source files are not changed; when a code correction applies, the served record retains the publisher's code as sourceAreaCode.
| Change | What the API serves | Applies when |
|---|---|---|
| Opt-in canonical measure-unit presentation | On the explicit canonical request, each numeric value and any publisher-supplied interval bound is multiplied by the measure's declared scale; the response names the resulting unit and calculation. | GET /v1/data/{measure-id}?units=canonical |
curl "https://api.ukdataatlas.com/v1/corrections?measure=broadband-superfast-availability"/correctionsList reviewed correctionsRequest it
Get the first page of broadband-superfast-availability for local authorities:
curl "https://api.ukdataatlas.com/v1/data/broadband-superfast-availability?period=2025-07&geography=localAuthority&boundaryYear=2024&limit=5"Read the measure's full definition, including every period it's published for:
curl "https://api.ukdataatlas.com/v1/measures/broadband-superfast-availability"/data/{measure-id}Get observationsget/data/{measure-id}/seriesGet a time seriesSource and licence
| Dataset | Publisher | Licence |
|---|---|---|
| Broadband Coverage | Ofcom | Open Government Licence v3.0 |
Using this data in something you publish? Get attribution text with measure=broadband-superfast-availability returns the credit line to include.
Downloads
Download complete publisher-observation files instead of paging through the API. Each file has a stable hash and covers one measure, period set and source geography. Any reviewed served code correction is documented and retains its publisher code on the affected record. The source and licence information above applies to these files too; preserve the attribution and note any cleaning or reformatting when you redistribute one.
| Measure | Coverage | Records | Download |
|---|---|---|---|
Full fibre availabilitybroadband-full-fibre-availability | Local authorities · July 2025 · code year 2024 | 361 | JSON |
Gigabit broadband availabilitybroadband-gigabit-availability | Local authorities · July 2025 · code year 2024 | 361 | JSON |
Superfast broadband availabilitybroadband-superfast-availability | Local authorities · July 2025 · code year 2024 | 361 | JSON |
Ultrafast broadband availabilitybroadband-ultrafast-availability | Local authorities · July 2025 · code year 2024 | 361 | JSON |